Dvorana bonifika

Dvorana bonifika

Investor: 
Mestna občina Koper
Project: 
2011
Size of the project: 
20000 m2
Task: 
Oblikovati tehnologijo športa in dogodka v arhitekturni presežek.
Solution: 

Režija dogodka oblikuje aritekturo. Arhitektura ustvarja vzdušje, ki iz tekmovanja ustvari dogodek. S funkcionalnimi rešitvami ustvarimo popolno osredotočenje na areno, na tekmo, zgostimo žarišče na parter. Tribuna postane arhitekturni/oblikovni element, opna pa z mehko valujočo slojevitosjo dematerializira volumen in odseva strukturo bližnje površine morja.

task:
The aim is to design the technology of sports.

solution:
The strategy is to design the architecture by directing an event. The architecture is creating an atmosphere that transforms the competition into event as the functional solutions are generating an intense focus into arena and to the game. The tribune turns into and architectural element and the outer layered membrane in soft curves dematerializes the huge volume and reflects the texture of the sea.